L.B.White I-3 Instrucciones Y Manual Del Propietario página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12
I-3 Radiant Heater
Mounting
To steel crate panels
a. Position the heater onto the crate panel at the
desired location.
b. Mark the location using the heater's saddle
bracket mount as a template. See Fig.4. Remove
heater.
FIG. 4
c. Using the drill template from the safety chain
kit (included) position its holes at the locations
previously marked. Drill 1/8 in. pilot holes at both
sides. See Fig. 5.
FIG. 5
d. Remove and drill 5/16 in. holes through both
sides of the metal crate panel.
e. Position the heater back onto the panel. Align
the holes in the heater's saddle bracket with the
drilled holes in the panel. Lock the heater into
place by pushing the retaining pin completely
through both sides of the bracket. See Fig.6.
Proceed to Safety Chain Installation Instructions
Owner's Manual • I-3
FIG. 6
To PVC or ABS crate panels.
All installations with PVC or ABS crate panels must
use kit # 500-132216, which includes base mounts and
hardware to install two heaters. The base mount must
be used as it supports the heater while acting as a heat
shield
a. Position the heater to the base mount using the
retaining pin.See Fig.7.
-- Saddle bracket of heater aligns to either set of upper
holes at ends of base mount.
-- Heater canopy must be positioned over the base
mount. See Fig.7.
FIG. 7
b. Locate the heater with mount to the planned position
on the crate panel. Push the assembly firmly onto
the panel.
c. Using the lower base holes as templates, drill 5/16
in. holes through the divider panel , both sides. See
Fig.8. Secure the base mount to the panel with nuts
and bolts included. Proceed to Safety Chain Installa-
tion Instructions.

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido