Erreka VULCAN Guía Rápida De Instalación Y Programación página 11

Ocultar thumbs Ver también para VULCAN:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
1 Mount the socket joint.
Before doing this, apply grease to
the ball bearing joint and the piston
rod.
4 Mount the operator on the rear
support.
ø
Vertical pin:
=12mm, L=37mm
7 Loosen the discharge screw (P).
If the operator has to be dismounted,
retighten the screw in order to
prevent the oil from leaking out.
Levelling
Assembly
2 Mount the fork.
ø
Horizontal pin:
=10mm, L=57.2mm
5 Mount the operator on the front
support. Before doing this, apply
grease to the ball bearing joint and the
support pin.
Models with slowdown: adjust the
socket joint in order to achieve the
required slowdown distance.
8 Mount the gland and introduce the
cables.
VU models have 4 cables; VUS models
have 6 cables.
The operator must work horizontally:
to do this, the supports must be
positioned with a height difference of
19 mm.
Check horizontality with a spirit level.
3 Mount the supports. Carry out
t h e w e l d i n g w i t h t h e o p e r a t o r
withdrawn to a distance, in order to
p r e v e n t t h e s p i n d l e f r o m b e i n g
damaged by the welding.
6 Mount the cover and the top.
9 Complete the electrical connections
as shown in the section below. Then
position the cover (T) and tighten the
gland.
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vulcan s

Tabla de contenido