2 ÷ 3 mm
Once having installed the burner, check the following items:
- The burner power feeding and the main line protection fuses
- The correct length of pipes and that sames are sealed.
- The type of fuel, which must be suitable for burner.
- The connection of boiler's thermostats and all safeties.
- The motor direction of rotation.
- The correct calibration of the motor's thermal protection.
When all said conditions are checked and accomplished, it is possible to go on with burner's tests.
Power the burner. The control box feeds at the same time the ignition transformer and the burner's motor,
which will run a prepurging of the combustion chamber for about 13 seconds (20 seconds with Brahma con-
trol box). At the end of prepurging, the control box opens the fuel pump solenoid valve, the ignition transfor-
mer produces a spark and the burner ignites. After a safety interval of 5 seconds and a correct ignition, the
control box turns off the ignition transformer. In case of faulty ignition, the control box switches the burner
into safety condition within 10 secs. In such a case, the manual rearming of the burner shall not take place
before 30 seconds are elapsed from the burner's safety shutdown. The fuel pump feeding pressure, must keep
around 12 bar. Note: With preheated version, the burner runs a preheating of the combustion head for about
1 minute. In such a case, at the boiler's thermostats make, the ignition signal shall be done by the thermostat
mounted on the preheater itself.
AIR REGULATION
FIRING HEAD SETTING
3 mm
5/6 mm
BURNER START-UP AND ADJUSMENT
+
–
B
+
TUBE DISASSEMBLY
pag.9
LB1122 Minor 1.1/1.1 R
AIR REGULATION
To adjust air flow , loo-
sen the two screw B
and turn the air dam-
per as required.
Tighten the screw B.
-
B