Descargar Imprimir esta página

Contractor Certification Requirements; Related Manuals - Accu-Flo Meter Service Veeder-Root TLS2 Manual Del Usuario

Publicidad

Idiomas disponibles

Idiomas disponibles

Introduction
This manual describes setup and operating procedures for the following Touch-Screen consoles:
• Veeder-Root TLS2
• Gilbarco EMC2
TLS2 Underground Storage Tank (UST) Console. It assumes that your system has already been set up by a
Certified Contractor. This manual assumes that the console is installed and has successfully completed the Cold
Boot procedure. You should begin the setup procedure with the System Setup Screens and finish with the Tank
Setup Screens.
After entering the System and Tank Setup parameters the console should be operational. Consult the Reports
Section for instructions on viewing system and alarm reports. The Diagnostic Section contains some simple
console test procedures and access to Probe Diagnostic data.

Contractor Certification Requirements

Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit routing,
equipment mounting, probe and sensor installation, tank and line preparation, and line leak detector installation.
Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perform installation checkout,
startup, programming and operations training, troubleshooting and servicing for all Veeder-Root Tank Monitoring
Systems, including Line Leak Detection and associated accessories.
Warranty Registrations may only be submitted by selected Distributors.

Related Manuals

577013-756
TLS2/EMC2 Site Prep Manual
1

Publicidad

loading

Este manual también es adecuado para:

Gilbarco emc2