Door installation
i
I (
24 detail1) Fasten the knobs to the door as shown; first
insert the plastic bush in the hole.
i
I (
24 detail 2-3) Insert the gasket on the upper side and
then the bushes in the hinges.
i
I (
25 detail 1-2-3) Insert the plastic protection under the
door. Then line it up with glass panel, inserting the door hinges
into the ones on the glass panel, and fasten them with the thread-
ed pins.
i
I (
26 detail1-2) Loosen the screws of the hinges and check
that the magnets close perfectly, as well as the distance (which
must be constant) between the lower side of the door and the
tray (by means of the plastic protections).
If this is not the case, slide the hinge assembly (detail 3a) un-
til the magnets match; also use a piece of wood and a rubber mal-
let, placing the two magnetic gaskets in contact (detail 3b).
Once this operation has been completed, tighten the screws
(detail 4).
Then remove the protections (detail5) and insert the covers on
the hinges (detail 6).
i
I (
27 detail 1-2) Depending on the model of shower box
(right or left), place the two terminals on the gasket. Remove the
film from the double-faced tape and then apply the gasket to the
door (detail 2), ensuring that the profile "X" with the magnet ad-
heres to the double-faced tape of the end.
Final steps
i
I (
28) Snap in the cover profiles as shown.
Installation of the seat
i
I (
29 detail1-2-3) Set the seat alongside its structure and,
from behind, connect the tube "L" (from the mixing group, see
i
13) to the pipe holder of the waterfall.
i
I (
29 detail 4-5) Place the seat and press in the indicated
zones, so that the springs connect to the tubular frame.
Then fasten the seat using the indicated screws.
Top installation
i
I (
30 detail 1-1a) Insert the rubber supports for the top
cover, making sure that they are inserted in the correct direction.
NB: Part of the support must be removed and thrown away (de-
tail 1a).
i
I (
30 detail 2a-2b) Apply the gasket.
(detail 3) Fasten the block for the fastening of the top with the
two plastic grub screws provided.
i
I (
31, detail 1) Install the roof and fasten it as indicated.
If necessary, turn the eccentrics to align the slot with the holes
of the supports below.
i
I (
31, detail2) Further fasten the roof, as shown.
i
I (
32) Cut to size two sections of gasket to be applied un-
der the seat (from the bottom up), as indicated.
i
I (
33 ) Place the footboards on the tray, as shown.
Before the unit is finally placed at the user's disposal, it
is advisable to carry out a demonstration cycle for all
functions in the presence of the user and to explain the
required routine maintenance tasks and their frequency.
Electrical safety
Ω
The
mega Jacuzzi
®
ufactured in compliance with standards EN 60335-1, EN 60335-
2-105, EN 61000, EN 55014-1, EN 55014-2. They are tested
during production to guarantee user safety. Installation must be
carried out by qualified and authorized personnel, in compliance
with the national provisions in force.
It is the responsibility of the installer to choose the
materials with regard to their use, to carry out the
work correctly, to check the condition of the system
to which the appliance is to be connected and its
suitability in order to guarantee user safety.
Ω
mega shower enclosures are Class "1" appliances, and must
be anchored securely and connected permanently, without any
intermediate joints, to the electric network and earth system.
The electric network and earth system of the build-
ing must be in working order and must comply with
the provisions of the law and specific regulations in
force in that country.
An appropriate device must be provided, which
form part of the fixed system, and installed in com-
pliance with current legislation in force, with the pur-
pose of disconnecting the appliance from the mains.
For connection to the electric mains, you will need to install an iso-
lating multi-pole switches, which will ensure complete disconnection
in the instance of a category III over voltage; these devices must be
connected to an area that complies with the safety regulations gov-
erning bathroom safety.
The switch and other electrical devices must be lo-
cated, in accordance with regulations, in an area that
cannot be reached by the person using the appliance.
If the building's electrical system is not able to gua-
rantee a stabile power supply, it is recommended to
install a voltage stabiliser that suitably dimensio-
ned for the required power upstream of the equip-
ment.
The installation of electrical devices and appliances (sockets,
switches, etc.) in bathrooms must comply with the legal re-
quirements and standards of the country concerned. In particu-
lar, no electrical installation is permitted within 60 cm of the
shower enclosure or at a height of less than 225 cm.
11
shower boxes are safe appliances, man-