DALI Setup
After DALI devices are wired and powered, they must be addressed before the
system can control them. The "Build System" command automates this process.
Note: All existing DALI programming will be deleted when the "Build System"
command is run, including DALI sensor programming on the GRAFIK Eye
control unit.

Building the System

1. Enter programming mode.
Main menu
2. Use the Master buttons to highlight "DALI" and press the
Zone setup
OK button to accept.
DALI
3. Use the Master buttons to highlight "Build system" and press
the OK button to accept.
4. Press the OK button to erase all current programming, reset
DALI
and address DALI devices, and find sensors on the system.
5. Exit programming mode.
Build system
Assign zones
Note: After running "Build System", Zone 4 will control all DALI
Build system
Erase digital load
Programming?
Searching...
x
Found
x Loads
Found
®
1
9
devices for diagnostics and verification of wiring. (This
feature is disabled once any of the addressed devices
are assigned to a zone on the GRAFIK Eye
unit.) Use the Zone 4 raise/lower buttons to verify that
all devices are correctly addressed. If a device does not
respond, repeat the "Build System" command and/or
check the wiring.
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye
2
10
3
11
4
12
5
13
6
14
QS
®
QS control
®
QS with DALI Control Unit Quick Installation and Operation Guide 14
®
7
15
8
16
9-16
1-8
OK
1
9
2
10
3
11
4
12
Master
buttons
OK
button
Timeclock
(back) button
5
13
6
14
7
15
8
16
Use Zone 4
raise/lower
buttons
to verify
1
all DALI
devices
have been
addressed.