General Introduction; Initial Inspection; Splash Resistance; Battery Installation - YSI EC300 Manual De Operaciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

GENERAL INTRODUCTION

The model EC300 is one of three instruments in the EcoSense product line from YSI. The
EC300 is a precision tool that measures conductivity, salinity and temperature. A built-in
microprocessor calculates and compensates for all parameters related to conductivity and
temperature determinations.
This unit has a splash-resistant IP65 case. The mechanical touch keys are highly reliable with
tactile and audio feedback. This instrument uses one 9V battery. Re-calibration is not required
when power is restored.
The front of the instrument has a large LCD that displays temperature and either temperature
compensated or non-temperature compensated conductivity, salinity or TDS simultaneously
along with user prompts and mode indicators. The unit prompts users through calibration and
measurement procedures.
The model EC300 is available with a single four-electrode cell. Other features include automatic
conductivity ranging, automatic temperature compensation, long battery life, and 50/60 Hz AC
noise rejection. This meter is universal and user-friendly for field, industrial and laboratory
applications.

INITIAL INSPECTION

Carefully unpack the unit and accessories, and inspect for shipping damages. Compare
received parts with materials listed on the packing list. Notify YSI immediately of any damage or
missing parts. Save all packing materials until satisfactory operation is confirmed.

SPLASH RESISTANCE

Though the EC300 instrument is housed in a splash proof case, DO NOT use it underwater; the
connector is not waterproof. The splash-resistant case prevents permanent damage to the unit if
accidentally dropped into non-corrosive solutions. In case of submersion, follow these steps
immediately:
1.
Dry the connector if necessary, and replace the conductivity probe. Rinse unit carefully with
distilled water. After rinsing and drying, inspect and clean connectors to remove all
contaminants that may affect probe connections.
2.
Wait for the unit and probe to dry completely before resuming operation.
3.
If the unit does not function correctly after steps 1 and 2, call YSI for possible repair or
replacement (see Warranty).

BATTERY INSTALLATION

An initial display of "BAT" on the LCD indicates approximately one hour
of battery life for unit operation within specifications. Replace battery
when "BAT" appears on the LCD. (See Figure 1.)
To replace battery, remove the two battery cover screws, battery cover
and o-ring. Replace the 9V battery. Replace battery cover and o-ring
(align the o-ring properly to insure a good seal) and fasten the two
battery cover screws for the splash-resistant feature.
3
Figure 1.
Battery Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido