h) Fit the curve of the cyclone (8) and place the cyclone
(9).
4.5- Machine levelling and positioning
The machine must be installed on even, leveled as
rigid ground to a good performance.
To end the job, fit the four dumper rubbers (9) under the
support (5), on the points indicated on picture.
9
16
8
5
5
9
9