ENGLISH
Remove the carton packaging from bottom to top.
When unpacked check if the device is according
to the order.
In case of any difference inform the sales agent
immediately.
8.2.
Installation (service technician)
All the stages of the installation must be carefully
planned.
The location should be equipped with all supply
connections and production waste outlet. The
location should also be properly lit and comply
with all hygiene and sanitary requirements
according to the binding regulations.
The appliance should be installed with the minimum
GB
5 cm clearance from the wall, if the wall is not
resistant to the minimum temperature of 150 °C.
Locate the device in the horizontal position by
adjusting the individual feet.
When the device is to be
installed near the walls, partitions,
kitchen cabinets, decorative elements,
etc., they must be made from non-
flammable materials or covered with
suitable non-flammable materials.
To ensure the correct operation
of the device, the device must be
installed
thoroughly ventilated room only.
and
operated
in
Do not store the packaging
materials (nylon bags, polystyrene
foam, clips ...) in the reach of children!
Remove the protective PVC layer from the out and
inner surfaces. If possible, do not use any metal
tools.
Internal installation of the gas supply and the rooms
in which the appliance is housed, must comply with
the local regulations applicable in the country in
which the appliance is used (Regulation of 12 June
96 and UNI-CIG 87/23).
In order to ensure the proper gas burning in
the igniters, the required volume of air, that is
the
ca. 2 cubic meters per hour for every kW of
installed power, must be supplied.
10
5 cm
ID 06