Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Please follow the illustrations below for detailed set up
of shiroGEL VERTICAL 20 system
1. Assemble each gel cassette on a flat level
surface, by placing the plain glass plate down
with the spacers facing upwards followed by the
notched glass plate.
2. Loosen the vertical screw-pins in the PAGE
insert to release the locking mechanism,
allowing the gel clamps to sit in the resting slots.
3. Insert a gel cassette into each side of the inner
buffer chamber in the PAGE insert, and begin
tightening the vertical screw-pins.
4. Continue to tighten the screw-pins until the gel
clamps glide out of the resting slots and fix
firmly against the glass plates pushing them
upright.
5. Check the bottom of the glass plates to ensure
that they are flush together, and place the
PAGE insert on the casting base; make sure
that the cams are facing downwards.
6. Insert cams and turn until tightened, drawing the
PAGE insert onto the casting to form a leak-
proof seal.
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

700-0353700-0354

Tabla de contenido