Descargar Imprimir esta página

Zeiss Axio Observer Serie Manual Breve página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 63
Axio Observer
8
INSTALLATION CONDITIONS
The ambient conditions (humidity, temperature, pressure) specified in Section 7 should be adhered to.
When documenting fluorescence preparations, do not expose the microscope to direct sunlight. This
helps minimize the influence of stray light.
For prolonged experimental procedures using the microscope (e.g. involving incubation or long image-
recording procedures) choose an installation location with minimum vibration.
Vibration stemming e.g. from forced ventilation, floor impact noise or other shocks can have an impact
on the supplementary modules of the microscope, some of which react sensitively. It can also lead to
reduced image quality and experimental errors.
To reduce vibrations at the microscope installation location, ZEISS offers various passive and active
damping options (Axio Imager (000000-0477-190 anti-vibration plate); small, air-damped system table
(000000-1984-812), table top mat TS 150).
Select an installation site which is as temperature-stable as possible for long-term observations.
For reliable long-term observations, the device must first warm up. The temperature equilibrium is
attained within 3-5 hours, depending on the light source, electronics and room temperature control. This
time must be planned into critical studies.
Space requirements:
The following requirements apply regarding installation of the device:
Dimensions of Axio Observer stand (width x depth x height):
approx. 295 mm x 850 mm x max. 707 mm
The distance of the system to the wall should be at least 15 cm, in order to ensure sufficient air
circulation and accessibility of the cabling.
09/2017
INSTALLATION CONDITIONS
431004-6044-008
ZEISS
11

Publicidad

loading

Este manual también es adecuado para:

Axio observer 3Axio observer 5Axio observer 7