Flush-Mount Installation - Dell POWER EDGE 1950 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Figure 2-4. Installing the Mounting Rails for Center-Mount Configuration
1
two-post open-frame rack
2
mounting rails (2)

Flush-Mount Installation

The two-post rack kit is shipped with the brackets configured for a 7.62-cm (3-inch) wide center-mount
installation. See Figure 2-1 for mounting rail components. To prepare the mounting rails for flush-mount
installation in the two-post rack, perform the following steps:
1 Locate the two mounting rails and place them side by side on a smooth work surface, with the front
ends of the mounting rails toward you (see Figure 2-5).
2 Using a 3/8-inch wrench or nut driver, remove two nuts from the adjustable mounting bracket
(see Figure 2-5).
1
2
12-24 x 0.5-inch pan-head
Phillips screws (4 per rail)
4
system rails (2)
2
3
4
5
6
3
center-mount mounting flange
6
release latch
Two-Post Rack Installation
33

Publicidad

Tabla de contenido
loading

Tabla de contenido