Descargar Imprimir esta página

Sub-Zero PRO 48 Instrucciones De Instalación página 20

Ocultar thumbs Ver también para PRO 48:

Publicidad

Idiomas disponibles

Idiomas disponibles

P R O 4 8
I N S TA L L AT I O N
The importance of the installation of the
Sub-Zero PRO 48 cannot be overemphasized.
Proper installation is the responsibility of the
selling dealer or installer.
IMPORTANT NOTE: To ensure a safe and
proper installation, the following checklist
should be completed by the installer to ensure
that no part of the installation has been over-
looked.
Any questions or problems about the
installation should be directed to your
Sub-Zero dealer or go to the locator page of
our website, subzero.com, to find the regional
distributor by country.
20
I N S TA L L A T I O N C H E C K L I S T
C H E C K L I S T
I N S TA L L A T I O N C H E C K L I S T
Has the packing material been removed?
Has any damage to stainless steel been
noted?
Turn the unit on. Is it operating properly? If
not, is the unit plugged in? Is the control
button turned on?
Is the water supply line connected and not
leaking?
Has anti-tip bracket been installed securely?
Is the unit leveled properly on a solid, level
floor?
Has the drain pan been installed properly?
Is the kickplate installed?
Are the grille screws back in position?
Are the doors and drawers adjusted for
proper operation, sealing and alignment?
Does either door need a 90° door stop?
Does your customer understand the unit's
operation?
Is the water supply turned on and ice maker
switch on?

Publicidad

loading

Este manual también es adecuado para:

Icb648proIcb648prog