DBI SALA Sealed-Blok Serie Instrucciones Específicas página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 32
A
Engagement Knob Pull Ring
B
Extension Pole Release Tool
C
Pull to descend
D
Release to stop descent
E
Pull and turn counterclockwise for hands-free Descent Mode
F
270
o
G
90
o
H
Insert Fork under Pull Ring and Knurled Ridge on Engagement Knob
I
Fork can be inserted from 90
J
Push Pole forward to descend
rsQ InspeCtIon
RSQ™ Controlled descent SRl inspection: In addition to performing the inspection procedures recommended
for all Sealed-Blok
SRLs, a hand pull test should be performed on RSQ™ Controlled Descent SRLs prior to each
TM
use:
Step 1.
Set knob to RSQ position.
Step 2.
Grasp the cable and pull firmly to engage descent mechanism.
Step 3.
Continue to smoothly pull out approximately 3 feet (1 m) of cable. Steady resistance should be felt
when pulling out cable.
Figure 9 - assisted Rescue operation
to 270
o
o
10

Publicidad

Tabla de contenido
loading

Tabla de contenido