2.4
Attach the power supply to the power jack on the back of the Switch.
(Refer to diagram below.)
2.5
Power up the connected servers. Check for keyboard, video, and mouse
function on each port.
To install your Switch in a daisy-chain configuration, please refer to the
User Manual.
5458ea-F1DA1xxz -QIG.indb 7
Connect the Console
7
6/5/07 4:28:33 PM