Maintenance Schedule - Scheppach SG1200 Traducción De Las Instrucciones Originales De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

14. Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
IMPORTANT! The equipment must be filled with engine oil and fuel before it is started.
Before each use
Checking the engine oil
Changing the engine oil
Checking the air filter
Cleaning the air filter
Cleaning the petrol filter
Visual inspection of the
equipment
Cleaning the spark plug
Checking andreadjust-
ing the throttle vale on
the carburetor
Cleaning the cylinder
head
Set the valve play
Important: The positions marked with "x*" should only be carried out by an authorized dealer.
20 / GB
After an operating
period of 20 hours
X
For the first time,
then every 50
hours
X
X
After an oper-
After an operat-
ating period of
ing period of 100
50 hours
hours
X
X
X
Distance: 0.6
mm, replace if
necessary
After an
operating
period of
300 hours
Change the
filter insert if
necessary
X*
X*
X*

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

590621298559062149015906214903

Tabla de contenido