Descargar Imprimir esta página

Maintenance Schedule - MoJack XT Instrucciones Para Asamblea Y De La Operación

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 21
Folding the MoJack XT
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower out of the Base by pulling up on the
Lift Handle and then lower the Tower.
• Secure the Tower by rotating Tower Locking Pin until
the ring drops into locking slot.
THE MOJACK XT IS NOW READY FOR STORAGE OR TRANSPORT.
STEP 22
Raising the MoJack XT with a power drill
(optional)
• The MoJack XT can be raised or lowered by using a
variable speed corded drill (7 amp minimum) or variable
speed cordless drill (18V minimum).
• The drill will require a 3/8" square driver (not provided).
• Remove Crank Handle by taking out the nut and bolt
which reveals the 3/8" Square Receiver.
• Firmly insert the 3/8" driver in the Square Receiver.
Rotate the drill forward (clockwise) to raise
the Lift Arm and rotate the drill in reverse
(counterclockwise) to lower the Lift Arm.
• Carrier Locking Pin must be pulled out when
lowering until it clears the bottom Safety Hole.
Operator must have a firm grip on the drill before
raising or lowering the Lift Arm.
• Follow all other operating instructions while using the
drill attachment.
• Replace the Crank Handle for future use.
MoJack XT Lift
Tower Locking Pin
(unlocked position)
Tower Locking Pin
(locked position)
3/8"
Square
Driver
Square
Receiver
Screw
Thread
18

Maintenance Schedule

• Before each use, always check for any worn, loose or
damaged parts on the MoJack XT. If any damaged parts
are present, do not use the MoJack XT and contact
MoJack at 1-877-575-3173.
• Clean and oil the screw thread after every 50 uses or at
least once a year using light machine oil.
• Place lithium grease between the Crank Handle Base and
the brass bearing after every 50 uses or once a year.
Without weight on carrier, lift the Crank Handle to create
a small gap between the brass bearing and the Crank
Handle Base. Use a small brush to apply the lithium
grease between the two surfaces.
• Place lithium grease on or around Screw Thread Bottom,
Roll Pin and Screw Thread Bottom Washer after every 50
uses or at least once a year.
• Spray grease or lube in Locking Pin holes and shaft after
every 50 uses or at least once a year.
• (Optional) Check for Carrier Locking Pin operation. Turn
top Crank Handle to raise the Lift Arm to the first Safety
Hole and listen for click as pin pops into hole. After a
click is heard, reverse direction of Crank Handle rotation
without pulling on the Carrier Locking Pin ring. Pin
should hold Carriage at height. Do not force the handle
past the lock point, as this may damage the Screw
Thread. If Carrier Locking Pin does not hold Lift Arm
height, do not use the MoJack XT and contact MoJack at
1-877-575-3173. After checking Carrier Locking Pin
operation, proceed to lower by pulling out on the Carrier
Locking Pin ring.
MoJack XT Lift
Crank Handle Base
Brass Bearing
Screw Thread
Roll
Screw Thread Bottom
Pin
Screw Thread
Bottom Washer
Tower Locking Pin
19
Carrier
Locking
Pin
Pull Out
to Lower
Safety Hole

Publicidad

loading