Descargar Imprimir esta página

MoJack XT Instrucciones Para Asamblea Y De La Operación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly Instructions
STEP 4
Attach the Grip Handle
to the Tower
with
7
1
two Carriage Bolts
and two Nylock Nuts
13
15
Grip Handle 7
STEP 5
Attach the Crank Handle
to the Tower
by inserting
8
1
Carriage Bolt
with threads facing up and fasten with
13
Nylock Nut
.
15
Note: There are two holes in the Crank Handle. The hole
closest to the rubber grip will provide a 6" radius for
cranking. The other hole will provide an 8" radius, making
cranking easier. Use the hole that works best with your
model of lawn mower.
STEP 6
Hang the Lift Arm
on the Carrier by hooking
2
the slotted area of the Lift Arm under the top
bar of the Carrier. Lift Arm must be inserted
from the front and then lowered which fastens
Lift Arm into place. Insert Clevis Pin
through
17
the hole in the Carrier and lock by fastening the
Small Hair Pin
to the Clevis Pin.
18
MoJack XT Lift
Carriage Bolt 13
.
Nylock Nut 15
Tower 1
Crank Handle 8
Nylock Nut 15
Carriage Bolt 13
Top Bar of Carrier
Lift Arm 2
8
STEP 7
Slide Lift Arm Inserts
of the Lift Arm
Push Pins
16
STEP 8
Ready the Wheel Pads
Support Rods
1
Tower
STEP 9
Carrier
Slide the Wheel Pads
sides of the Lift Arm Inserts
secure with Push Pins
Note: The Wheel Pads can be moved
in or out to fit different mower widths.
Use the configuration that works best
with your model of lawn mower.
Small
18
Hair Pin
17
Clevis
Pin
MoJack XT Lift
Assembly Instructions
into both sides
6
and secure with
2
Push Pin 16
as shown.
Lift Arm Insert 6
Wheel Pad 5
for installation by adding
5
and Large Hair Pins
.
11
19
Large Hair Pin 19
onto both
5
5
Wheel Pad
and
6
.
16
THIS COMPLETES ASSEMBLY.
9
Lift Arm 2
16
Push Pin
Lift Arm Insert 6
Support Rod 11
16
Push Pin
Lift Arm Insert 6

Publicidad

loading