USE
10. Daily operation
"Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
MANUAL POWERING
DT version with display
1
ON
Press the luminous main switch.
The the keys light up and the following message will appear
on the display:
S
3
While waiting for the machine to be ready for use, insert
The machine is ready to work when the display indicates
the working pressure:
02_M26_UNICO_1817.indd 10
.
2
If the water level in the boiler is lower than the minimum
this phase, the
icon will appear in the lower left hand
corner of the display.
The preset working pressure must be reached before the
machine is ready for use.
If one of the
keys is pressed during this phase, coffee
will be served at the temperature reached at that moment.
If any dispensing key is pressed, the following message will
appear on the display:
S
MACHINE COLD
PLEASE WAIT
S
wednesday
. At the end of
15:18:12
03/05/2018 16:48:19