Burner Calibration - Riello RL 64 MZ Instrucciones De Instalación, Funcionamiento Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

(A)
Burner
Off
On
(B)
RL 64 MZ
α
GPH
4.00
26
4.50
28
5.00
31
5.50
33
6.00
35
6.50
36
7.00
37
2nd STAGE
RL 64 MZ
kg/h
mbar
mbar = air pressure in 1) with zero pressure in 2)
33
4.7
37
4.2
41
3.7
45
3.2
49
2.6
53
3.2
57
4.2
60
5.1
63
6.0
66
6.4
69
7.3
(E)
Stage
1
2
1st STAGE
α = Notch Nr.
V
P
D468
1st
2nd
D469
(C)
(D)
D7467
9

BURNER CALIBRATION

FIRING
Set switch 1)(B) to "ON".
During the first firing, during the passage from
the 1st to the 2nd stage, there is a momentary
lowering of the fuel pressure caused by the filling
of the 2nd stage nozzle tubing. This lowering of
the fuel pressure can cause the burner to lock-
out and can sometimes give rise to pulsations.
Once the following adjustments have been
made, the firing of the burner must generate a
noise similar to the noise generated during op-
eration. If one or more pulsations or a delay in
firing in respect to the opening of the light oil
solenoid valve occur, see the suggestions pro-
vided on p. 14: causes 34 to 42.
OPERATION
The optimum calibration of the burner requires
an analysis of the flue gases at the boiler outlet
and interventions on the following points:
• 1st and 2nd nozzles
See the information listed on page 5.
• Combustion head
The adjustment of the combustion head already
carried out need not be altered unless the 2nd
stage delivery of the burner is changed.
• Pump pressure
12 bar: This is the pressure calibrated in the fac-
tory which is usually sufficient for most purposes.
Sometimes, this pressure must be adjusted to:
10 bar in order to reduce fuel delivery. This ad-
justment is possible only if the surrounding tem-
perature remains above 0°C. Never calibrate to
pressures below 10 bar, at which pressures the
cylinders may have difficulty in opening;
14 bar in order to increase fuel delivery or to en-
sure firings even at temperatures of less than
0°C.
In order to adjust pump pressure, use the screw
5)(A), p. 8.
• 1st stage fan air gate valve
Keep the burner operating at 1st stage by set-
ting the switch 2)(B) to the 1st stage position.
Opening of the air gate valve 1)(A) must be
adjusted in proportion to the selected nozzle:
the index 7)(A) must be aligned with the speci-
fied in table (C). This adjustment is achieved by
turning the hex element 4):
- in rh direction (- sign) the opening is reduced;
- in lh direction (+ sign) the opening increases.
Example
1st stage nozzle 4.00 GPH:
26° notch aligned with index 7(A).
When the adjustment is terminated lock the hex
element 4) with the ring nut 3).
• 2nd stage fan air gate valve
Set switch 2)(B) to the 2nd stage position and
adjust the air gate valve 1)(A) by turning the
hex element 6)(A), after having loosened the
ring nut 5)(A).
Air pressure at attachment 1)(E) must be
approximately the same as the pressure speci-
fied in table (D) plus the combustion chamber
pressure measured at attachment 2)(E).
Refer to the example in the adjacent figure.
NOTE: in order to facilitate adjustment of hex
elements 4) and 6)(A), use a 3 mmc Allen key
8)(A).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

34704103470411974 t

Tabla de contenido