Installation To Wood Joist Ceilings
• Installer must verify that the supporting surface will safely support the combined load of the
equipment and all attached hardware and components.
• Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening
can damage the screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to
edge" stud finder is highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into
wood studs. Installers are responsible to provide hardware for other types of mounting situations
(not UL evaluated).
Place projector mount assembly (A) on ceiling as a template and mark the center of the two
2
mounting holes. Make sure that the mounting holes are in the center of the wood joist. Drill two
5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly
(A) with two #14 x 2.5" (6 mm x 64 mm) wood screws (D) and two flat washers (F) as shown in
figure 2.1 or figure 2.2 depending on joist orientation.
NOTE: Mounting slots on projector mount assembly allow for 30° (±15°) of rotation before fully
securing wood screws.
Tighten wood screws (D) using 3/8" (10 mm) socket wrench, phillips screwdriver or 10 mm open
end wrench until projector mount assembly (A) is firmly attached.
Skip to step 5.
fig. 2.1
A
WOOD jOIST
F
D
WARNING
ACCESS SLOT FOR
OPEN END WRENCH
ALLOWS TIGHTENING
OF WOOD SCREW (D).
A
5 of 51
ACCESS SLOT FOR
OPEN END WRENCH
ALLOWS TIGHTENING
OF WOOD SCREW (D).
WOOD jOIST
F
D
ISSUED: 09-30-09 SHEET #: 056-9024-1
fig. 2.2