1. INSTALLATION
After uncrating your dough sheeter, check for the following:
• Two conveyor tables
• One rolling pin
• Two conveyor table supports
Assemble the machine as follows:
1. S crewonoutriggerboltsandfastenscrewnunderframeboxfirmly.
2. Attach the conveyor tables
3. Check whether the top and bottom scrapers are correctly attached.
4. F ittheplasticflourbox
5. Have the machine connected by an electrician. Please follow the instructi-
ons below and the wiring diagram.
IMPORTANT:
It is very important to ensure that if the right button/lever is pressed, the con-
veyor belts operate to the right and that they operate to the left when the left
button/lever is pressed. The phase sequence set-up must be strictly observed.
If the machine is connected to different power outlet, check immediately that
the conveyor belts are operating in the proper direction. Safety check for the
proper functioning of the protective grid. When the grid on the feed side is
raised, the machine should stop immediately.
NOTE: Before attaching or removing the conveyor tables: always disconnect
the electrical power at main breaker or unplug the machine.
SINMAG EUROPE WILL NOT ACCEPT CLAIMS FOR DAMAGES
OR ACCIDENTS RESULTING FROM NON RESPECT OF THESE
INSTRUCTIONS.
2. ELECTRIC INSTALLATION
SINMAG EUROPE BVBA
ENG
3