II. PACKING LIST
Before starting installation, ensure the box contains:
1 User manual
1 Controller with 1 cell cable
1 Chlorination cell with 2 nuts, 2 flanges 2,
1 Kit of clamping screws & inserts
III. INSTALLATION
A – INTRODUCTION
Before proceeding with the installation of the device, it is very important to check the following points:
The hydraulic equipment should be in good working order and correctly sized. In particular,
check the output from the filtration pump, the capacity of the filter and the diameter of the
pipes.
The device's treatment capacity should be adapted to the volume of water to be treated and to
the climate where it is being installed. A device which can treat a volume of 50 m
temperate climate, should be limited to a 40 m
water use.
Water pressure in the cell should not exceed 3 bars.
The technical area should be dry and properly ventilated, protected from rain, splashes,
discharges of water and UV radiation. Non-observation of this instruction will lead to abnormal
oxidation of the metallic parts which could result in a complete breakdown of the device.
Assembly of the electronic box and its attachments must strictly conform to the following
installation diagram.
3
family pool in a hot climate or in case of wells
3
3
in a