Descargar Imprimir esta página

Cash Acme TANK BOOSTER HEATGUARD 020 Serie Manual Del Usuario página 20

Ocultar thumbs Ver también para TANK BOOSTER HEATGUARD 020 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
TANK BOOSTER PRO ONLY
The TANK BOOSTER PRO includes a recirculation port to allow return
water from the system to be connected directly back into the mixing
valve. To use this recirculation port, remove the blanking plug using
an Allen key (3/8")
1. Tempered water supply to system
2. Tempered water return from system
3. Circulating pump
4. Non return valve
5. Cold water supply
6. Mix outlet
7. Mixing valve recirculation port
8. Cold inlet
Installation of a thermal expansion device should be installed after the non return
valve on the cold water supply prior to entering the water heater.
NOTE: This diagram is a guideline only. Any installation of a recirculated system
should be undertaken by a qualified tradesperson, and in accordance with the rele-
vant codes and State, Provincial and Local Authority requirements. Performance of
the system will be dependent on the other components specified within it.
TANK BOOSTER
Installation Instructions
IS279 REV L
2-17-16
IN
RECIRCULATED
20
SYSTEMS

Publicidad

loading

Este manual también es adecuado para:

Tank booster heatguard 021 serie