Mounting The Payload - Festo EGC-FA Instrucciones De Utilizacion

Ocultar thumbs Ver también para EGC-FA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EGC-FA
Interfaces for mounting components
On the cover
E.g. with foot mounting HPE
1) è www.festo.com/catalogue
Tab. 1
Note
Danger of screws being pulled out if the axis is only mounted to the covers and the
torque load around the longitudinal axis is too great.
• If there is high loading, mount the axis on the profile with additional mounting com­
ponents.
• Push the transverse connection over the complete stroke path from one end position to the other.
The guide axis will then position itself to the drive axis without any tension. If necessary, use a con­
nection with tolerance compensation.
• Tighten the mounting screws evenly.
Size
Screw (cover)
Tightening torque
Tab. 2
5.1.2

Mounting the payload

• Position the payload in such a way, that the break-down
torque resulting from force F (parallel to the axis of motion)
and lever arm (a) remains as low as possible.
• Attach the payload to the slide with screws and centring
sleeves.
• Comply with the maximum screw-in depth D (è Tab. 3).
Festo – EGC-FA – 1507a English
On the profile
1)
E.g. with slot nuts NST
70
M5
[Nm]
5.9
1)
E.g. with profile mounting MUE
80
120
M5
M 8
5.9
24
a
Fig. 4
Fig. 5
1)
185
M10
47
F
19

Publicidad

Tabla de contenido
loading

Tabla de contenido