In the chart you can see that for each
3.
pair of sprockets-wheels (A) and (B)
corresponds a different speed of the
drums.
The table shows speeds in ascending
4.
order, from lowest to highest.
Loosen the tensioner bolt (F);
5.
Move the tensioner to loosen the roller
6.
chain (G);
LENGTH OF THE
Remove the chain (G);
CHAIN
7.
Links
Joint links
Remove the sprocket wheels (A) and (B);
8.
63
1 CL + 1 HL
61
1 CL
63
3 HL +1 CL
Insert another pair of sprockets as intended
9.
59
1 CL
63
1 CL + 1 HL
(increase or decrease speed).
63
5 HL + 1 CL
57
1 HL + 1 CL
61
1 CL
63
2 HL + 1 CL
63
6 HL + 1 CL
61
1 CL
63
2 HL + 1 CL
63
1 CL + 1 HL
61
1 CL
ON!
sprocket gears
ons
bove.
ns not indicated
m and cause loss
ty.
CHOPPING OPTIONS
QTY.
CHOPPING
GEARS
OF
KNIVES
12
6
4
3
B
CHOPPING OPTIONS
QTY.
CHOPPING
GEARS
OF
SIZES
KNIVES
12
2 mm
6
5 mm
4
7,5 mm
3
10 mm
Instructions Manual
SPROCKET
SPEED OF
WHEELS
SIZES
THE DRUMS
A
2 mm
1
Z11
lower
5 mm
2
Z11
7,5 mm
3
Z16
10 mm
4
Z11
5
Z16
6
Z20
7
Z11
8
Z16
9
Z20
10
Z25
11
Z20
12
Z25
13
Z25
higher
14
Z25
DRUMS
SPROCKET
SPEED OF
WHEELS
THE DRUMS
A
lower
1
Z11
2
Z11
3
Z16
4
Z11
5
Z16
6
Z20
7
Z11
8
Z16
9
Z20
10
Z25
11
Z20
12
Z25
13
Z25
higher
14
Z25
A
G
B
4. Preparation
DRUMS
LENGTH OF THE
CHAIN
B
Links
Joint links
Z30
63
1 CL + 1 HL
Z25
61
1 CL
Z30
63
3 HL +1 CL
Z20
59
1 CL
Z25
63
1 CL + 1 HL
Z30
63
5 HL + 1 CL
Z16
57
1 HL + 1 CL
Z20
61
1 CL
Z25
63
2 HL + 1 CL
Z30
63
6 HL + 1 CL
Z16
61
1 CL
Z20
63
2 HL + 1 CL
Z16
63
1 CL + 1 HL
Z11
61
1 CL
LENGTH OF THE
CHAIN
B
Links
Joint links
Z30
63
1 CL + 1 HL
Z25
61
1 CL
Z30
63
3 HL +1 CL
Z20
59
1 CL
Z25
63
1 CL + 1 HL
Z30
63
5 HL + 1 CL
Z16
57
1 HL + 1 CL
Z20
61
1 CL
Z25
63
2 HL + 1 CL
Z30
63
6 HL + 1 CL
Z16
61
1 CL
Z20
63
2 HL + 1 CL
Z16
63
1 CL + 1 HL
Z11
61
1 CL
F
47