Descargar Imprimir esta página

Filling The Tank; Filling - CEMO DT-Mobil Easy Manual De Instrucciones

Sistema de depósito diésel móvil

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 54
GB
12
Fig. 5.3.3: Belt recesses on 430 l tank
i
Important!
Positive fit before traction!
First, try to positively load the equipment
(e.g. through striking the sides).
Excessive lashing forces can deform the tank
and thus damage it.
Recommendation:
Use a non-slip mat.
Attention!
Danger of material damage to the
filling station 125 l and 200 l with lid.
The lid on these tanks does not have any clamp
locks, but clicks into place only by means of ten-
sioning bolts. The air stream may open the lid and
could rip it off.
Therefore always transport the filling station with
the hinges facing the direction of travel.
15
Fig. 5.3.4: Belt recesses on 200 l tank
l Belt recesses
m Hinges
n Locking bolt
o Direction of travel
22
12
13
12
14

5.4 Filling the tank

1. Unscrew the cap on the filling opening (item 2).
2. Fill the container through the filling opening using
a delivery nozzle with automatic shut-off feature.
3. After filling, close the filling open tightly again
with the cap (item 2).
4. Contamination of the container caused by the
filling process must be removed immediately
with a dry cloth.
Fig. 5.4.1: Filling opening
on 125 l / 430 l tank

5.5 Filling

1. For the version with lid, either
a open both clamping locks j
(430 l / 460 l / 600 l tank) or
b pull the lengthened corners apart slightly
(125 l / 200 l tank) to release the locking
bolts n and lift up the lid.
2. Clamp the terminal clamps e to a suitable
voltage source (see type plate for tank or pump).
Observe the colour coding:
red = positive terminal (+)
black = negative terminal (-)
3. Open the delivery line ball valve c.
4. Switch on the pump f at the switch (f a).
5. To fill, remove the delivery nozzle g from the
holder and insert it fully into the container/tank
to be filled
6. Operate the automatic delivery nozzle g
(if necessary, lock with locking device)
and carry out filling operation.
Tank ventilation and pressure relief are performed
automatically by the integrated valve a.
i
Important!
Constantly monitor the filling process.
2
Fig. 5.4.2: Filling opening
on 460 l / 600 l tank

Publicidad

loading