Zoeller 1052 Manual Del Usuario página 6

Bombas de sumidero sumergibles
Ocultar thumbs Ver también para 1052:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
4. Make sure your hands are dry and you are
not standing in water. Connect the pump to a
properly-grounded, GFCI electrical outlet.
WARNING: Do not use an extension cord.
NOTE: Tape the electrical cord to the discharge
pipe to prevent it from interfering with the
motion of the float.
5. Test the operation of the pump by pouring water
into the sump basin. The pump will turn off
automatically when the water level in the basin
reaches the "off" level.
Model
On Level
1052
8.25 in.
1096
6. Install a sump basin cover to complete the
installation.
Off Level
4.8 in.
9 in.
3.9 in.
© 2020. All rights reserved.
4
5
A
6
6
115 V
GFCI Outlet
115 V
GFCI Outlet
A
Sump basin
cover

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1096

Tabla de contenido