Osmofilter LITEL 100 J-100 Manual De Usuario página 37

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

USER'S MANUAL
9. DIAGRAMMATIC DRAWING OF WATER
INSTALLATION
NOTES:
There are some differences between drawings in
manual and real object. The practice is subjected to real
object.
Main materials and equipment to be installed:
2
Water
Tap water
source
1. Main system.
2. Ball valve of water inlet.
3. Sewer.
4. Water storage jug.
Materials needed in installation:
PE Pipe
Tissue
TDS Test Pen
Monkey Wrench
5
4
Pure water
Concentrated water
1
5. Water faucet.
Wrench
Towel
Jug
Tube Cutter
Electric Drill
Screw driver
10. INSTALLATION OF COMPLETE SYSTEM
NOTES:
The installation shall be conducted by professional in
local sell on commission and service site.
INSTALLATION:
1.
Take out the product from packaging box and put it
under water groove in the kitchen.
3
2.
Take the three-way siamesed ball valve out and install
it on tap pipe.
3.
Connect the pipeline and install the part of water
storage according to the diagrammatic drawing of
water installation.
4.
Concentrated water can be flowed to sewer or be
recycled and reused.
Concentrated
water
11
Sewer
EN

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido