7.3.5 Basement drainage
According to EN 12056-4, a pump sump is to provided for the automatic drainage of the
installation room for faeces lifting units (Fig.9).
• Design pump (item 10) according to the delivery head of the unit. The dimensions of the
pit in the floor of the installation room should be at least 500 x 500 x 500 mm.
• By switching, a 3-way cock (item 11, accessories) allows both the tank to be manually
drained as well as the pump sump using a diaphragm hand pump (no. 12).
14
13
3
7
6 8

7.4 Electrical connection

DANGER! Risk of fatal injury!
Improper electrical connections pose a risk of fatal injury due to electric shock.
• Only allow the electrical connection to be made by an electrician approved by the local
electricity supplier and in accordance with the local regulations in force.
• Observe the installation and operating instructions for the switchgear and the acces-
sories.
• Disconnect the power supply before starting any work
• The current type and voltage of the mains connection must correspond to the specifica-
tions on the name plate.
• Mains side fuse protection:
• DrainLift XL 2/10: 25 A, slow
• DrainLift XL 2/15: 25 A, slow
• DrainLift XL 2/20: 25 A, slow
• DrainLift XL 2/25: 25 A, slow
NOTE: To increase the operational reliability, it is mandatory for an automatic circuit
breaker (which disconnects all power leads) with K characteristic to be used.
• Earth the system according to regulations.
• It is extremely important to use a residual-current-operated protection switch ≤ 30 mA in
accordance with the applicable local regulations.
• The switchgear and breakdown barrier must be installed in dry, overflow-proof rooms.
The national regulations are to be observed for the positioning [in Germany: VDE 0100].
• Ensure the separate supply of the alarm switchgear (accessory) in accordance with the
rating plate data. Connect the alarm switchgear.
• Apply the clockwise rotating field.
• The technical connection conditions of the local energy supply company are to be
observed for the connection.
1
2
2
3
4
5
6
12
7
9
8
11
9
10
11
12
10
13
13
Backflow level (usually top edge of street)
Ventilation line (via roof)
Pressure pipe
Inlet
Gate valve for inlet pipe
Valve support for weight relief
Gate valve for pressure pipe
Non-return valve
Tank drainage pipe
Pump sump drainage pipe
Drainage pump
Three-way cock
Diaphragm hand pump
Breakdown barrier
DrainControl PL2 switchgear
WILO SE 03/2011

Publicidad

Tabla de contenido
loading

Tabla de contenido