Step 5: Synchronisation connections
Connect the (single sided) or both (double sided) cable(s) for the card(s) synchronisation.
IMPULSION or AFNOR
Cable from main wire bundle
(client wiring)
NTP
Single sided
Master clock electronic card
Main wire bundle
(client wiring)
Step 6: Power supply connections
Connect the (single sided) or both (double sided) cable(s) for the card(s) power supply.
Cable from main wire bundle
(client wiring)
To clock 1
To clock 2
(double sided only)
RJ12
To clock 1
To clock 2
(double sided only)
To clock 1
To clock 2
(double sided only)
Cable from main wire bundle
(client wiring)
Double sided
Main wire bundle
(client wiring)
RJ45
To clock 1
To clock 2
(double sided only)
Cable from main wire bundle
(client wiring)
Master clock electronic card
RJ12
RJ12
Slave clock electronic card
EN
RJ45
9