For the cantilever arm to be ready for operation, fi rst the ground sleeve must be mounted appropriately.
The screws to fasten the ground sleeve are not supplied. Take care to fasten and align the ground sleeve
Insert the cantilever arm into the mounted ground sleeve.
The lower cantilever arm has 8 holes for the latching bolt in its lower, round part. They allow a locking in
steps of 45°. Without locking the arm can swing within the range of 360°.
Press with the thumb on the pressure pin to release the socket pin and pull it out.(
Then fl ip the upper cantilever arm up (
Now the cantilever arm has been mounted to its basic setup.
To demount, follow the steps in the reverse order.
A
Preparation for operation
IKAR Canti lever Arms
Attention:
correctly.
) and secure it with the socket pins (
B
B
Before the IKAR Cantilever arm can be operated, its
Before the IKAR Cantilever arm can be operated, its
appropriate mounting must be verifi ed by an authorized person
appropriate mounting must be verifi ed by an authorized person
according to BetrSichV Section 10. Then the IKAR Cantilever
according to BetrSichV Section 10. Then the IKAR Cantilever
arm can be operated. The operating instructions of the IKAR
arm can be operated. The operating instructions of the IKAR
Cantilever arm as well as of other IKAR devices must be
Cantilever arm as well as of other IKAR devices must be
27
)
A
).
C
C
Note:
observed at all times.
GB
Abbildung ähnlich