6) Spread the sealing glue around the male thread of grease supplying
system, connect it into the female thread of grease inlet, and then fix them
together.
7) Turn on all check valves of grease system.
8) Handle the trigger to spray enough grease as reference to 3; make sure
the grease system circle clean.
9) Repeat steps 6 to 8 for the other location of grease control valve.
1.3.3 Replace the grease control valve's installation
- Loose and take the replaced grease control valve off the system.
- Do the step 6 to 9. from 1.3.2 .
1.4. Grounding
1.4.1 The grounding is to maintain the security system.
1.4.2 To reduce static electricity, each unit of the system should carry out
effective grounding.
- Control valve is done by manufacturers' recommendation.
- Air and fluid hoses need effective grounding too.
- Air compressor is done by manufacturers' recommendation.
- The grease barrels: effectively grounding
- Staying grounded is needed in the working and grease release process,
especially the metal units are sure to be grounding before operating the
control valve.
2 LCD Display
2.1 See the following displaying illustration of the LCD panel.