Best PIK33 Instrucciones De Instalación página 9

Ocultar thumbs Ver también para PIK33:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

13. CONNECT WIRING (ALL BLOWERS)
Risk of electric shock. Electrical wiring must be done by qualified personnel in accordance with all applicable
codes and standards. Before connecting wires, switch power off at service panel and lock service disconnecting
means to prevent power from being switched on accidentally.
Position insert below the installed custom hood. Pull cable through hole in top of insert.
INTERIOR BLOWER: Remove the cable knock-out on the top of the rough-in plate. Remove rough-in plate wiring cover. Place the wire
clamp in the knock-out hole, insert the cable through the wire clamp in the rough-in plate wiring box. Tighten the wire clamp to secure
the cable.
Connect cable into wiring box using provided wire connectors.
Connect wires as follow: BLACK to BLACK, WHITE to WHITE and GREEN or BARE wire
under ground screw. DO NOT FORGET TO CONNECT THE GROUND. Reinstall wiring
cover.
IN-LINE OR EXTERIOR BLOWER: Remove rough-in plate wiring cover and connect wiring (see instructions included with in-line or
exterior blower).
14. INSTALL THE ROUGH-IN PLATE (ALL BLOWERS)
INTERIOR BLOWER:
Carefully install the rough-in plate inside the top of
the insert with four (4) lock nuts. See picture
beside.
IN-LINE OR EXTERIOR BLOWER:
15. INSTALL THE TRANSITION (INTERIOR BLOWER)
Slide the transition over the adapter/damper. Seal the transition to the adapter/damper by using
duct tape.
WARNING
!
Refer to instructions included with ILB3, ILB6, ILB9, ILB11, EB6, EB9, EB12 or EB15 rough-in kit.
Secure the rough-in plate inside the top of the insert with (4) lock nuts.
1) Ground screw
HD0042
- 9 -
1
HD0007
HD0091

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pik45

Tabla de contenido