Kohler K-994 Guia De Instalacion página 7

Ocultar thumbs Ver también para K-994:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hot Supply
Notch
4. Connect the Supplies
Apply sealant tape on the ½" NPT hot and cold supply pipes and
thread into the base.
NOTE: The base has a blue mark and a notch on the cold supply
side.
Insert the plug into the base.
Turn on the main water supply and check for leaks.
Turn off the main water supply.
Secure the guard onto the base with the screws provided.
Kohler Co.
Plug
Screw
Base
Cold Supply
7
Guard
1144501-2-E

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-10129

Tabla de contenido