Full Glass Panel Installation - fortress Pure View Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 3:
Apply Spray Paint To Cut Areas
1� Using a piece of cardboard as a mask, apply the 1
Fortress zinc based touch-up paint�
2� Allow to dry before applying second coat�
3� Apply the 2
4� Allow to dry and install�
Fig. 1
2X

FULL GLASS PANEL INSTALLATION

Step 1:
Install I-Support On Bottom Rail
1� Measure and locate the center of the bottom rail� Using the
I-Support as a guide, mark the center of the 2 screw holes�
As shown in Fig� 1�
2� Using a 3/16" [4�5mm] drill bit, drill though the outside wall�
3� Install the I-Support with the provided Phillips Head thread
cutting screws� As shown in Fig� 2�
Note:
• Be sure to install I-Support on side of rail facing deck�
Fig. 1
12
coat of Fortress zinc based touch-up paint�
nd
3/16"
[4�5mm]
Hole
PURE VIEW: Al
FULL GLASS PANEL INSTALLATION
13
Fig. 2
coat of
st
Phillips
Head
Thread
Cutting
Screws

Publicidad

Tabla de contenido
loading

Productos relacionados para fortress Pure View

Tabla de contenido