Step 2:
Install Bottom Rail
1� Install cut bottom rail into the lower installed brackets�
2� Pre-drill Bracket Cup holes for screws using a 3/16"
[89�5mm] drill bit�
3� Secure rail to Bracket Cups with provided T-25 Drive
Thread-Cutting Screws� Use low speed setting on drill�
Tip:
• It is recommended to apply a small amount of liquid soap to
the black gasket openings in the top and bottom rails before
installing Full Glass� As shown in Fig� 3� The Liquid soap helps
the glass settle in place�
Fig. 1
Fig. 2
Set
Screw
PV FGP I-Support
PURE VIEW: Al
FULL GLASS PANEL INSTALLATION
13
Fig. 3
Evolve
External
Cup
Evolve
External
Cup
13