fortress Pure View Instrucciones De Instalación página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Fig. 2
B
C
B
Step 2:
Pre-Drill and Install Brackets
Tip:
• It's important to double check dimensions to confirm
accuracy of bracket hole locations before drilling.
1� Use Spring Punch to mark the holes� As shown in Fig� 1�
2� Pre-drill bracket holes with a 3/16" [89�5mm] drill bit� As
shown in Fig� 2�
3� Use scrap wood as support and drill through center holes in
bracket base� As shown in Fig� 3�
4� Attach Bracket to the posts with supplied T-25 thread-cutting
screws� Use two screws per bracket� Use low speed setting on
drill� As shown in Fig� 4�
5� Once top and bottom brackets are installed, remeasure
bracket spacing to confirm dimensions used in Fig� 2 and 3
of step 1� As shown in Fig� 5�
6� Remove all metal shavings from deck, post base cover,
post, and panel before bracket is screwed to post to
prevent corrosion�
Fig. 1
B
A
D
PURE VIEW: Al
FULL GLASS PANEL INSTALLATION
13
A
Fig. 2
9

Publicidad

Tabla de contenido
loading

Productos relacionados para fortress Pure View

Tabla de contenido