Installation Procedures
Positioning
WARNING: Before
Select a location that will allow
beginning any installation
accessibility to the Airblade
work you must confirm the
and proper clearance from
following:
surroundings and floor. Make
sure that the unit is installed in
Make sure that the electrical
compliance with all building
supply has been disconnected or
codes and/or regulations.
switched off before attempting
Position the mounting template
installation to avoid the risk of
provided on the wall where the
electrical shock or electrocution.
Airblade
installed.
Ensure no pipe work (gas, water,
air) or electrical cables, wires or
ductwork are located directly
Fig 1
behind the drilling area.
Recommended heights are shown
in
Fig 1
, but may need to be
TM
adjusted for each individual
installation.
Mark the 6 mounting holes as
highlighted in
Verify marks are level and in the
correct locations.
hand dryer is to be
TM
Drill holes where marked.
Bracket mounting height:
Bracket mounting height:
39" adult male height
39" adult male height
36" adult female height
36" adult female height
32" child/wheelchair user height
32" child/wheelchair user height
Electrical supply connection
Electrical supply connection
29.75"adult male height
29.75"adult male height
26.75"adult female height
26.75"adult female height
22.75"child/wheelchair user height
22.75"child/wheelchair user height
Floor
Floor
There are two electrical entrance
locations available to ease with
the installation of the Airblade
hand dryer. Mark only one of
the electrical supply locations
illustrated in
Fig 1
and drill the hole
Fig 1
.
large enough to accommodate
the incoming flexible metal conduit
and supply cable.
Fig 2
2"
Mounting Bracket
Ensure that marks are level and
in the correct location as illustrated
in
Fig 2
.
TM
Securely fasten the mounting
bracket to the wall.
Recommended minimum anchor
size of 0.25"
Dyson Airblade
TM
hand dryer
ENG
6