The use of a cable of type Н07RN (WDE0282) is recommended, whereby measures must
be taken to protect against mechanical damage.
Connect the supply cable to the appropriate terminals in the input box (L1, L2, L3, N, РЕ) -
see following figure. If there is a СЕЕ plug, the connection to the mains is made by an
appropriately supplied СЕЕ coupling (L1, L2, L3, N, РЕ).
Plug connection 400V:
16.4 Connecting to a dust collection system
The machine must be connected to dust collection system. The system must start up
at the same time as the motor of the band saw starts. The suction hoses used must
be flame-retardant (DIN4102 B1), permanently antistatic (or grounded on both
sides) and comply with the relevant safety regulations.
Collection system integrated in machine.
OPERATION
17.1 Operating Instructions
Handling the machine while it is connected to the power source can result in serious
injury or even death. Always disconnect the machine from the power supply before
carrying out retrofitting work and secure it against unintentional restart!
Never start the machine with a workpiece pressed down!
In the case of resin residues on the wood, it may be advisable to apply an
appropriate lubricant to the machine table in order to ensure uniform sliding of the
workpiece over the planing table.
17.2 Initial check before starting work:
Check that all guards are installed.
Check whether suitable planing knives have been correctly assembled.
Whether the planer shaft knives are worn out; replace knives if necessary (see
Maintenance section)
Check whether the connection to a dust collection system is available.
Check that the planer shafts rotate in the correct direction.