Preparing the Therapy Unit
The therapy unit should be fitted to the footboard of the hospital bed, or if required, placed on a solid
stationary surface.
1. Fit the therapy unit to a footboard of a hospital bed:
•
Pull out the green hanger at the back of the unit.
•
Fit over the footboard. Spring pressure will hold the unit in place.
2. Plug the mains power supply cord into the TheraKair Visio MRS Therapy Unit.
3. Plug power supply cord into a power outlet.
Power supply cord
4. Plug the air supply connector into the therapy unit.
i
The air supply connector will only connect to the therapy unit in one orientation. Rotate the
connector until it locks in place.
Hanger
Air supply connector
17