Descargar Imprimir esta página

Installation And Start-Up; Installation; Important; Start-Up - Ugin ARTIS NEO Modo De Empleo

Ocultar thumbs Ver también para ARTIS NEO:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Instructions for use (rev 290319)

4. INSTALLATION AND START-UP

4.1. Installation

Install the furnace in a well-ventilated area and make sure it is at least 10 cm from walls or other
surfaces.
IMPORTANT: We recommend that the furnace be operated on a separate electric circuit.

4.2. Start-up

 Connect the vacuum pump socket (No. 4)
 Plug the vacuum hose into the connector (No. 3)
 After checking that the mains voltage matches that noted on the rating plate, plug the cord
into a standard 10/16 A socket with a ground terminal
 Turn on the main switch (No. 1), you will hear a beep
 Press the STAND-BY key (No. 3):
 The platform moves down, stopping in low position (FOR ROUGHLY 5 MINUTES)
 Put the base on the platform
 You may now set the program parameters
Note: see chapter 2.1 – equipment description
 Choose the language
The furnace is delivered with the display screen in "French". To modify:
- Push simultaneously on
- With the key
or
UGIN DENTAIRE
and
choose the language and enter by pressing
Languages:
0 – French
1 – German
2 - Spanish
3 – English
4 – Italian
5 – French
ARTIS NEO
24

Publicidad

loading

Productos relacionados para Ugin ARTIS NEO