Reading Of Cycle Counter; Cycle Counter; Signal Of Service Required - V2 ATRIS-700 Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 70

11 - READING OF CYCLE COUNTER

The PD22 control unit counts the completed opening cycles
and, if requested, it informs the user after a preset number of
manoeuvres that maintenance operations are required.
There are two counters available:
A totalizing counter for completed opening cycles thatcannot
tot
be zeroed (option
of item
A downward counter for the number of cycles before the next
request for service (option
To access the menu follow these instructions:
1. Press and hold down the OK key until the
the display
2. Release the OK key: the display will show

11.1 - CYCLE COUNTER

Area 1 is the reading of the total number of completed cycles;
h
i
through
and
keys, you can alternate the display of thousands
or units.
Area 2 is the reading of the number of cycles before the next
request for service: its value is rounded down to the hundreds.
Area 3 is the setup of this latter counter; on first pressing the
h
i
or
key the current value of the counter is rounded to the
thousand, each press after this increases the setting by 1000 units
or decreases by 100. The previous displayed count will get lost.

11.2 - SIGNAL OF SERVICE REQUIRED

When the counter of the missing cycles on next maintenance
intervention reaches zero, the control panel signals the request for
maintenance through the writing
G1 (red) flashes during opening and closure.
This signal remain until the installer enters into the counter
reading and setup menu, and possibly programs the number of
cycles after which the next service will be requested.
In case no new value is setup (that is to say that the counter value
is left at zero), the signalling function for the service request will
be disabled and no signal will be repeated anymore.
m
WARNING: service operations shall be carried out by
qualified staff only.
Cnt
)
SErv
Cnt
of item
).
-Cnt
appears on
tot
SErv
on the display and led
The scheme hereafter shows how to read the totalizing counter,
how to read the number of cycles before the next service is
required as well as how to program the number of cycles before
the next request for service (as for the example shown, the control
unit completed no. 12451 cycles and there are no. 1300 cycles
before the next service request.
-Cnt
ESC
tot
SEru
-01.3
2
- 39 -
0 12.
.45 1
1
-03.0
-02.0
-01.0
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Atris-1000

Tabla de contenido