BADU JET Turbo Pro Traducción De Las Instrucciones Para El Manejo Originales página 76

Ocultar thumbs Ver también para JET Turbo Pro:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 262
Installation
Installation of the housing in a concrete and tiled pool
NOTICE
It is recommended to lay a surrounding ring of epoxy resin/quartz
sand at the pool-side outside wall of the housing (1) as a seal to
the concrete wall. See "Fig. 5" on page 21
Mount a concrete-resistant inlay 30 x 30 mm on the casing
on the housing prior to installation.
1.
Installation depth: The centre of the installation housing (1)
should be mounted 35 cm below the water level.
2.
Drill fastening holes into the casing according to the drilling
template.
3.
Clamp support slats (17) between the two overlaps of the
inside of the housing.
4.
Press in the foam rubber seal (11) without tension along the
groove on the housing (1) by hand. Fix with a drop of instant
glue on the floor side.
5.
Place the sealing beading (16) in the groove.
6.
Align the installation housing (1) according to the label
"OBEN/UP/ HAUT" and fix to the casing with the tapping
screws (51).
The rectangular cut-out in the casing is optional. This serves
for inspection or correct seating or also later installation of
the support slats.
When concreting, make sure that the concrete is filled up
from the bottom to the top and is vibrated tight and reinforced
several times on all sides.
7.
After the concrete has hardened, the inlay must be removed
and a seal applied flush with the front side with an epoxy
resin/quartz sand mixture.
8.
Screw the plastic panel to the housing (1) with 36 self-
tapping screws (51) with a torque of 6 Nm from the inside of
the pool.
NOTICE
Observe the hardening time for concrete!
Sealing should be applied as a composite seal in accordance
with the swimming pool standard DIN 18535.
22 EN
08|2020

Publicidad

Tabla de contenido
loading

Tabla de contenido