Cable Protective Tube; System Shaft; Electrical Control - BADU JET Turbo Pro Traducción De Las Instrucciones Para El Manejo Originales

Ocultar thumbs Ver también para JET Turbo Pro:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 262
Installation
Installation diagram for installation in a foil/steel or plastic
pool
Fig. 11
5.2.3

Cable protective tube

1.
Remove grease from the connection nozzle (d, (Fig. 15)) on
the plastic housing (1) and the connection socket of the cable
protection tube (12) with PVC-U/ABS cleaner.
2.
Coat both sides with PVC-U/ABS adhesive and then plug or
stick together.
5.2.4

System shaft

The system must be installed in a shaft which borders the edge of
the pool. The installation space must have perfect ventilation and
sufficient ground drainage. There must be a possibility for
fastening the frequency converter and the switch cabinet as well
as the cable protection tube (above water level if possible). There
must be a potential equalisation connection in the shaft. See point
0 on page 31.
There must be sufficient room for installation and removal of the
motor and drive unit.
5.2.5

Electrical control

The terminal box for the countercurrent system must be
accommodated in a dry room. The supply cables and system
must be connected according to the enclosed circuit diagram. The
pertinent regulations (VDE) must be observed. The Fi must be
type "B".
Start operation only with the terminal box and frequency converter
closed!
Use the cables included. Details of the cables are shown in a
separate overview diagram in chapter 5.4.
26 EN
08|2020

Publicidad

Tabla de contenido
loading

Tabla de contenido