Kohler STERLING SP2270A Serie Guia De Instalacion página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Remove a wall jamb
from each side panel.
Side Panel
Shower Base
1. Mark and Drill the Mounting Holes
Measure 36-1/8" (91.8 cm) (dimension "A") from the back shower wall (not receptor edge) to the
front ledge of the receptor and mark on the receptor with a pencil.
Repeat the measurement from the other back wall and mark the other side of the shower receptor.
With the caulking groove of the wall jamb toward the outside of the shower, align the outside leg of
the wall jamb with the mark on the shower ledge.
Align the outside edge of the wall jamb with the mark made on the shower ledge.
NOTE: The wall jamb must sit flat on the shower ledge. If the ledge has a curve in the corners at the side
wall, it may be necessary to shape the bottom end of the wall jamb with a file.
Using a level, plumb the wall jamb.
Mark the five wall mounting holes with a pencil.
Slowly drill a 5/16" hole at the marked hole locations.
Press and hold the legs of each wall anchor (provided) together and insert the wall anchor legs into
the pre-drilled mounting holes.
Repeat for all the wall anchors.
Thoroughly clean the ledge and wall of debris.
Repeat the above procedure for the remaining wall jamb.
1034050-2-E
Pencil
Wall Jamb
Level
Press and hold legs together.
Receptor Size 38" (96.5 cm) x 38" (96.5 cm)
Dimension A = 36-1/8" (91.8 cm)
4
Be sure caulking groove is
toward outside of shower.
Anchor
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido