5
ASSEMBLY
CAUTION!
Before starting the installation of the equipment it is necessary to pay attention to the following precautions:
•Make sure that the packaging is not damaged and that the parts and components of the equipment are not damaged.
•It is recommended that the equipment be unpacked at the place where it will be assembled.
•The assembly area should be clean.
•The floor must be level, firm and hard to prevent equipment instability.
•The area around the equipment must be free as described in this Manual (see the chapter Discovering the equipment).
•It is recommended that the equipment be mounted away from moisture and away from sunlight in order to avoid damaging
the electronic parts of the equipment.
•Make sure there are no children nearby during assembly, due to the risk of serious or fatal accidents. Dispose of the packaging
properly and do not allow children to play with the plastic that protect the equipment, due to the risk of suffocation.
•The icons are intended to indicate the tools needed to assemble the equipment, the number of people and the way the bolts
are tightened.
SCREW TIGHTENING TORQUE
SPECIFICATION TABLE
Diameter [mm]
M6
M8
M10
Fixed wrench
Allen
key
The tower assembly is the same for both sides of the equipment.
To mount the other side simply follow the same steps as described in the
ATTENTION!
The Crossover equipment uses several bushings for the pulleys. To find out which bushing to use, follow a 1:1 template of
bushings comparison to know which one to use in a particular assembly step.
BUSH n°20
Torque [N.m]
9-12
22-29
45-58
TOOLS
Thread lock
Philips
medium torque
screwdriver
BUSH n°25
For this assembly
it is recommended that
be made in three
or more people
Pliers for
Nivel
elastic rings
ATTENTION!
manual again.
BUSH n°32
10
ICONS
50%
100%
Do not completely
Perform the final
tighten the screws
tightening of the
BUSH n°34
BUSH n°33
bolts