14
ASSEMBLY
14.1
Preparatory activities
14.1.1 Delivery content
Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please understand
that later claims cannot be accepted anymore.
14.1.2 Workplace requirements
The workplace has to fulfill the requirements.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.
14.1.3 Transport
The machine can be transported in package with a forklift.
The machine is very heavy. The machine shall be lifted from crate with a suitable lifting device only
that is certified to be able to carry the machines load.
The lifting and transportation of the machine must only be carried out by
qualified staff and must be carried out with appropriate equipment.
Note that lifting equipment used (crane, forklift, sling, etc.) must be in perfect condition.
To maneuver the machine in the packaging can also a pallet jack or a forklift be used.
14.1.4 Preparation of the surface
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine surface.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.