PRCD Test
RESET
TEST
NOTE: Drawings for illustration purpose only. May not reflect actual product. Not to scale.
1. Insert the plug.
2. Press the "RESET" button, the indicator light turns on.
3. Press the "TEST" button, the indicator light turns off.
4. Press the "RESET" button, the indicator light turns on.
5. Press the "On/Off" button for 2 seconds, your pump is ready to use.
WARNING: The PRCD plug must be tested
before each use to avoid risk of electric shock.
WARNING: Before inserting plug into a power outlet,
make sure the current rate of the power outlet is suitable
for the pump.
WARNING: Do not use the pump if this test fails and
contact our Customer Service.
SPA PUMP EQUIPOTENTIAL BONDING TERMINAL
It is recommended to arrange for a qualified electrician to
connect the spa pump to an equipotential bonding terminal using
a minimum 2.5mm
Indoor and outdoor & above ground & portable wiring &
portable spa
WARNING: The selected location has to be able to
supportofsupporting the expected load.
WARNING: An adequate drainage system has to be provided to deal
with overflow water for both indoor and outdoor installations.
• Always keep the spa cover on to minimize heat loss during heating
of the spa between uses (but not while it is being used). Ensure the
cover is fitted tightly, as per instructions to maximize insulation. It
shall be recommended that the cover, when not in use, should be
303021213751_14x21cm_54138;54173_
Pump Test
RESET
TEST
1
2
2
solid copper conductor.
ASSEMBLY
HydroJet SPA
_
RESET
TEST
3
11
RESET
TEST
4