Closing The Enclosure; Securing The Enclosure - Mettler Toledo IND246 Guia De Instalacion

Ocultar thumbs Ver también para IND246:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
Clean any oil or other contaminants from the area of the overlay shown in Figure 2-73 where the
capacity label will be added. Peel the backing from the label and adhere it to the overlay in the
location shown in Figure 2-73, or another location acceptable to the local regulations.
2.9.

Closing the Enclosure

After all work has been completed inside the terminal, the enclosure must be snapped shut properly
to maintain its environmental integrity.
To properly close the terminal, follow these steps:
2.10.

Securing the Enclosure

When the IND246 terminal is used in a metrologically "approved" application, it must be protected
from tampering by use of a seal. A wire security seal is included with the terminal.
For sealing details of the IND246 terminal, refer to Figure 2-74 and follow these steps:
2-40
METTLER TOLEDO IND246 and IND246 POWERCELL Installation Manual
Capacity Label
in Place
1. Position the front cover over the rear housing then gently press it down into place.
2. Press down firmly in each of the four corners of the front cover in sequence until each
corner clip snaps audibly snaps into place.
3. It is very important that each of the 4 corner clips have snapped into place. When pressing
down on the cover during installation, listen for the "click" sound of each clip engaging.
1. Ensure that the appropriate approval region has been selected in setup under Scale > Type
> Approval, and that the Metrology security switch SW1-1 is in its ON position (refer to
Figure 2-68 and Table 2-6).
Figure 2-75: Capacity Label
Figure 2-76: Capacity Label Installed
64084463
|
03
|
12/2017

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ind246 powercell

Tabla de contenido